Dear Friends,
We got many mails across the globe regarding biogas purification and compression unit. The profile of 400m3 compressed biogas plant is herewith mentioned for better understand and minimising the enquiry in this regards.
1. Cost of biogas digester, purification plant and bottling unit: Rs.80 lakhs
2. Purified gas (Methane/CNG) production per day: 170kg
3. Bio-mannure production per day: 1.5 Ton
4. CDM benefits per annum: 1200 CER
5. Annual earnings from bottled gas: Rs.18.60 lakhs
6. Annual earnings from bio-manure:Rs.16.20 lakhs
7. Annual earnings from CDM @10Euro/CER: Rs.7.20 lakhs
8. Expenditures per annum including raw materials, salary, consumables, maintainance, interest etc: Rs.20.00 lakhs
9. Subsidy from MNRE: 40% of project cost
10. Payback period: 3-4 years
We offer turnkey contract services to set up the plant and preparing Detailed Project Report (DPR) by highly qualified and experienced consultants. The data in the report are reliable and up-to-date collected from suppliers and manufacturers. As we want to promote this technology in larger scale for serving to set up the plant on turnkey basis, we are charging INR.11,030/- (USD500) including service tax @10.30% for Detailed Project Report (DPR) and Rs.2,00,000/- for process knowledge, training to your personnel and turnkey contract services. One can get a grant of INR.100,000/- from MNRE for DPR preparation.
Content of Detailed Project Report (DPR) on Biogas Purification & Bottling System
1. Project at a glance
2. Board Outline of the Project
3. Company Profile (You have to Fill up)
4. Project Background and Introduction
5. General Information
6. Brief Description of the Project (Activity & Purpose)
7. Current status of the work
8. Details of approach intended to be adopted
9. Oppertunity
10. Project’s contribution to sustainable development
11. Evaluation of environmental impacts, Effect on Biological environment, Effect on Water quality, Effect on Air quality, Effect on land environment/soil, Effect on Noise pollution, Socio-economic effect and Aesthetic environment
12. Emissions and CDM benefits
13. Project Environment Management
14. Salient features of the project, Biomass availability, Biogas export and Sale of By-products.
15. Basis and Presumptions
16. Market Demand and Marketing Aspect
17. Production Capacity & Target
18. Process Technology and Technical details
19. Product description & uses
20. Requirement of Land Area, Built up Area, Plant layout.
21. Plant Location and Infrastructures
22. Plant Facilities with specifications
23. Raw Materials, Sources and Specifications
24. Utilities and services
25. Manpower Requirement and Planning
26. Project Implementation Schedule with Bar chart
27. Operational parameters like total biogas/methane generated, power consumed by the plant auxiliaries, and efficiency of the plant activity.
28. Financial Analysis
29. Conclusion
30. Annexure: Cost of Project, Means of Finance, Subsidies, Debt Equity ratio, Assumptions and Projections, Profitability Analysis with 100% capacity utilization, Profitability Analysis with 80% capacity utilization, Profitability Projection for Ten Years, Taxation Schedule, Proforma Balance Sheet, Fund Flow Statement, Working Capital Projections, Depreciation Schedule, Break Even point, Payback Period, Interest and Repayment Schedule, Schedule of Salary and wages, Financial Ratio etc.
This can be had through your email on payment in the shape of Demand Draft in favour of “Krishna Engineers & Consultants” payable at Bhubaneswar. You can also deposit the same in our ICICI current account No: 006105002038.
We look forward an early response from your side. Please feel free to ask any question in this project.
With Regards.
Pramod Hati
Krishna Engineers & Consultants
We got many mails across the globe regarding biogas purification and compression unit. The profile of 400m3 compressed biogas plant is herewith mentioned for better understand and minimising the enquiry in this regards.
1. Cost of biogas digester, purification plant and bottling unit: Rs.80 lakhs
2. Purified gas (Methane/CNG) production per day: 170kg
3. Bio-mannure production per day: 1.5 Ton
4. CDM benefits per annum: 1200 CER
5. Annual earnings from bottled gas: Rs.18.60 lakhs
6. Annual earnings from bio-manure:Rs.16.20 lakhs
7. Annual earnings from CDM @10Euro/CER: Rs.7.20 lakhs
8. Expenditures per annum including raw materials, salary, consumables, maintainance, interest etc: Rs.20.00 lakhs
9. Subsidy from MNRE: 40% of project cost
10. Payback period: 3-4 years
We offer turnkey contract services to set up the plant and preparing Detailed Project Report (DPR) by highly qualified and experienced consultants. The data in the report are reliable and up-to-date collected from suppliers and manufacturers. As we want to promote this technology in larger scale for serving to set up the plant on turnkey basis, we are charging INR.11,030/- (USD500) including service tax @10.30% for Detailed Project Report (DPR) and Rs.2,00,000/- for process knowledge, training to your personnel and turnkey contract services. One can get a grant of INR.100,000/- from MNRE for DPR preparation.
Content of Detailed Project Report (DPR) on Biogas Purification & Bottling System
1. Project at a glance
2. Board Outline of the Project
3. Company Profile (You have to Fill up)
4. Project Background and Introduction
5. General Information
6. Brief Description of the Project (Activity & Purpose)
7. Current status of the work
8. Details of approach intended to be adopted
9. Oppertunity
10. Project’s contribution to sustainable development
11. Evaluation of environmental impacts, Effect on Biological environment, Effect on Water quality, Effect on Air quality, Effect on land environment/soil, Effect on Noise pollution, Socio-economic effect and Aesthetic environment
12. Emissions and CDM benefits
13. Project Environment Management
14. Salient features of the project, Biomass availability, Biogas export and Sale of By-products.
15. Basis and Presumptions
16. Market Demand and Marketing Aspect
17. Production Capacity & Target
18. Process Technology and Technical details
19. Product description & uses
20. Requirement of Land Area, Built up Area, Plant layout.
21. Plant Location and Infrastructures
22. Plant Facilities with specifications
23. Raw Materials, Sources and Specifications
24. Utilities and services
25. Manpower Requirement and Planning
26. Project Implementation Schedule with Bar chart
27. Operational parameters like total biogas/methane generated, power consumed by the plant auxiliaries, and efficiency of the plant activity.
28. Financial Analysis
29. Conclusion
30. Annexure: Cost of Project, Means of Finance, Subsidies, Debt Equity ratio, Assumptions and Projections, Profitability Analysis with 100% capacity utilization, Profitability Analysis with 80% capacity utilization, Profitability Projection for Ten Years, Taxation Schedule, Proforma Balance Sheet, Fund Flow Statement, Working Capital Projections, Depreciation Schedule, Break Even point, Payback Period, Interest and Repayment Schedule, Schedule of Salary and wages, Financial Ratio etc.
This can be had through your email on payment in the shape of Demand Draft in favour of “Krishna Engineers & Consultants” payable at Bhubaneswar. You can also deposit the same in our ICICI current account No: 006105002038.
We look forward an early response from your side. Please feel free to ask any question in this project.
With Regards.
Pramod Hati
Krishna Engineers & Consultants