Dear Friends,

The 50% subsidy of the total project cost for compressed biogas plant (Biogas Bottling) is extended for another 6 months by MNRE, Government of India. The term loan can be availed up to 30% from NABARD/ IREDA/ KVIC/ Other financing institutions with 20% entrepreneur’s share. For this MNRE is inviting EOI from entrepreneurs/consultants/industries/NGOs/Institutions etc with a “Feasibility-cum-Detailed Project Report” on dated 03/07/2009 vide letter no: 7-2/2008-BE. The MNRE, GOI will also release Rs.100000.00 as a grant for preparing the “Feasibility-cum-Detailed Project Report”. The proposal will be scrutinized and sanctioned for a limited number of projects on first-cum-first basis.

We can prepare “Feasibility-cum-Detailed Project Report” as per requirement of MNRE to avail subsidy of 50% and Grant of Rs.100000.00 for preparing the “Feasibility-cum-Detailed Project Report”. Our charges for the same are Rs.100000.00 plus Service Tax @10.30%. For obtaining the FDPR, you have to place the order with an advance amount along with a letter of intent (LOI) and balance payment will be made after getting sanctioned of Rs.100000.00 as grant for FDPR from MNRE, GOI. If our FDPR will not eligible for assistance from MNRE, we will not charge any cost to you for the same and the advance payment made by you will be treated as advance for the turnkey contract to set up the plant.

We can take the turnkey contract for Design/ Engineering/ Supply/ Installation/ Trial Production for the CBG plant. We can also render our services for liaison with MNRE/ IREDA/ NABARD/ KVIC to get the sanction of Loans/Subsidies.

This CBG project is eligible to get CER for Methane avoidance and replacing the fossil fuels (Compression and utilizing methane as vehicular fuel).

We look forward your early enquiries for this project, as the approval for grants and subsidies will be done on first-cum-first serve basis.

Thanks and Regards.

Pramod Hati
Krishna Engineers & Consultants
4723, Laxmi Vihar, Sainik School
Bhubaneswar-751005